The first question a buyer usually asks a Chinese pipe fitting manufacturer is how much to order. A full container before the mill has been checked is a risk. An order small enough to be quoted carelessly is also a risk, and most quotations come back priced for a container, which leaves the buyer to work out the rest.
A trial lot is usually sized by guess. The quantity should follow from what you want to check, and that is worth deciding first.
What to check on the goods themselves
Start with the material certificate. One size, one heat, one 3.1, one packing list. If the number stamped on the piece is the number printed on the certificate and again on the list, the paperwork is tracing steel. If the sheet carries a number that no piece carries, nothing else on it needs reading. Our guide to reading a 3.1 certificate sets out the four points that matter.
Wall thickness is the next point, and it is worth doing properly. The nominal wall comes from the pipe schedule on the purchase order — ASME B36.10M for carbon steel, B36.19M for stainless. ASME B16.9 governs the dimensions of the fitting, not the wall; what a buyer is checking is whether the finished piece still carries the wall of the schedule specified, allowing for the mill tolerance permitted by the pipe specification.
The reading also has to be taken in the right place. On a wrought elbow the wall thins on the extrados and thickens on the intrados, so the thinnest point sits on the outside of the bend, not at the ends. A caliper will read the ends; the extrados is curved and needs an ultrasonic thickness gauge, taken at the same position on each piece so the numbers can be compared.
Above 10 inch the difference between schedules matters more. 12 inch STD is 9.53 mm against 10.31 mm for Schedule 40; 14 inch is 9.53 against 11.13. A mill holding STD pipe will sometimes stamp the piece to what it had in the yard rather than what the order called for, and only a reading on the piece will show it.
On the flange, the figures that stop a joint from mating are outside diameter, bolt circle, number and diameter of holes, and thickness. On a butt-weld fitting it is outside diameter, centre-to-end and overall geometry. A tape and a caliper settle these before the goods go on a rack.
Packing is worth a look as well. Ask for the trial to travel in the packing the real order will travel in, not a box made up for the occasion.
What a trial lot does not tell you
A mill that knows a lot is being judged will usually put its good pieces in it. The stamp will be right, the wall will be right, the certificate will be issued. This is less a matter of intent than of habit, and the request that answers it is a simple one: ask for the pieces to come from the material reserved for the following order, or from current production rather than made up for the sample.
Even then, a hundred pieces may come off a few lengths of pipe, one heat, one heat treatment. Two thousand of the same size will run across several heats, and within the specification heats differ in chemistry and in mechanical properties. A clean trial lot shows the mill can make a good piece. Whether it can make two thousand the same is a different question, and it is answered over the next two or three orders rather than in the first.
Lead time follows the same pattern. A trial is quick because it goes to the front. A full order is scheduled against everything else in the works, and that is where the delay appears. The date quoted for a small lot should not be assumed to hold for a larger one. Ask for a schedule built on the quantity and the specifications actually being ordered.
The cost, and what to agree before payment
On a small lot, freight and the minimum charge on a groupage booking can come to more than the goods. That belongs in the landed cost comparison, and it is the reason a trial is better judged on total cost than on unit price.
It is also worth asking the same product at two quantities, a hundred and a thousand. Some works quote the same unit price up to several hundred pieces and a different one above that; others move earlier. Where the price does not move, a small lot costs nothing in unit price and there is no trade-off to weigh.
Before payment, put the following in writing. Each size traceable to its raw material heat, and where several heats are used, cartons separated by heat with certificates issued to match. The 3.1 certificates with the shipment, early enough to be read before dispatch. Markings matching the agreed specification and standard. Export packing and marking as agreed, with sizes separated. And a statement that later orders will follow the same technical, inspection and packing requirements.
These are easier to agree before production than to settle after the goods have sailed.
If you are sizing a first lot, send the line list with the quantities you want to test. We will come back with the sizes, the weights and the freight on that quantity.