Consider two purchase orders for the same fitting: 90 degree elbow, NPS 16, A234 WPB, to ASME B16.9, with STD on one order and Sch 40 on the other. At 16 inch the STD wall is 9.53 mm and Schedule 40 is 12.70 mm, so the two elbows differ by 3.17 mm of wall.
STD and Sch 40 are the same wall from NPS 1/2 through NPS 10. Above NPS 10 they are not, and an order that treats them as one will be filled to whichever reading the mill applies.
Where the wall comes from
ASME B16.9 fixes overall dimensions, centre-to-end and face-to-face, outside diameter at the bevel, tolerances, end preparation, testing and marking. What it does not give is a wall thickness for each size, and it carries no pressure rating. The wall comes from the pipe the fitting is welded to: ASME B36.10 for carbon steel, ASME B36.19 for stainless. The required wall thickness or schedule should therefore be stated in the purchase order and identified on the fitting, and a schedule number, a wall thickness designation or the nominal wall in millimetres will each do.
From NPS 12 upward
From NPS 1/2 through NPS 10, standard weight and Schedule 40 are the same wall. That is where most of the confusion starts, and for the fittings a stockist handles most of the time the habit holds.
From NPS 12 the two part company. STD stays at 9.53 mm; Schedule 40 keeps climbing with diameter. At NPS 12, STD is 9.53 mm and Sch 40 is 10.31 mm. At 14 inch, 9.53 against 11.13. At 16 inch, 9.53 against 12.70. At 18 inch, 9.53 against 14.27. At 20 inch, 9.53 against 15.09. At 24 inch, 9.53 against 17.48. On a 24-inch line, the difference is 7.95 mm.
An order written “NPS 24, STD, Sch 40” contradicts itself. A supplier who accepts it without asking will follow one of the two readings, and the buyer may not receive the intended wall thickness.
Stainless runs on a separate table. Under B36.19 the 40S wall holds at 9.53 mm at 12 inch, where carbon Schedule 40 is 10.31 mm. The S series and the plain series are not interchangeable, and a line list that mixes them will show a mismatch at the first weld.
The 87.5 percent floor
For non-reducing fittings within its scope, B16.9 sets the minimum wall at any point at 87.5 percent of the nominal wall of the matching pipe, unless the purchaser specifies otherwise. On a 16 inch Sch 40 elbow the nominal wall is 12.70 mm and that floor is 11.11 mm.
The 87.5 percent is a floor and not the whole acceptance criterion. The design wall the service requires still has to be met, so a fitting that clears 87.5 percent at the extrados is not automatically acceptable everywhere on the body.
When an elbow is formed, the extrados stretches and thins while the intrados thickens. The standard accounts for this change in wall thickness and specifies a minimum. A mill that starts from a heavier blank, so the finished extrados stays above 87.5 percent, is not doing anything unusual.
The rejection that follows is common enough. An inspector gauges the outer curve, reads 11.4 mm against a nominal 12.70, and fails the goods. The goods may well meet the standard. The acceptance criterion was the problem: it was written against nominal wall, not against 87.5 percent of nominal.
Two things follow. Write the acceptance figure into the order, so nobody argues at site. And if the service needs a full nominal wall at the extrados, say so in the order, because the standard will not supply it by default.
Read the stamp before the gauge
Look at two elbows from stock: a 45 degree stamped 4 inch Sch40, and a 90 degree stamped 2 inch STD, each carrying size, grade and standard. B16.9 requires the marking to carry the manufacturer, the material identification, the size, and the wall thickness or schedule. A heat number is not part of that list, though most mills stamp one, and where it is stamped it should be read against the certificate.
The first check on arrival is the stamp: does the schedule on the elbow match the schedule on the order. Then the heat number, where the piece carries one, against the certificate. Only then measure, and measure the extrados of an elbow, which is where thinning is expected.
How to write the line
Give the size, the schedule and the standard in one line: NPS 16, Sch 40, ASME B16.9, A234 WPB.
From NPS 12 upward, add the wall in millimetres. That is where the schedule name stops being self-explanatory, and 9.53 mm or 12.70 mm leaves nothing to interpret.
For stainless, write the S schedule and the standard: Sch 40S, ASME B36.19.
Where one schedule covers several sizes, state it once and let it carry through, and check the large sizes separately.
What we do with a bill of materials
We supply butt-weld fittings to ASME B16.9 and flanges to ASME B16.5, in carbon steel and stainless steel, for importers and stockists in the UAE and Oman.
Send the bill of materials as it stands. Before quoting we check each line for the standard, the size and the schedule it should carry, and come back on the lines that do not resolve: a schedule that is missing, a grade that does not match the standard, a size above 24 inch, which has to be made to drawing. The quotation states the wall for every line, so the goods and the paper agree before anything is cut.